The free design package includes a rendering, installation layout, and quantity list. It helps the buyer review visual direction and product quantity before ordering, but it does not replace local engineering, construction, or regulatory review.
The free design package includes a rendering, installation layout, and quantity list. It helps the buyer review visual direction and product quantity before ordering, but it does not replace local engineering, construction, or regulatory review. The purpose is to give overseas B2B buyers a clear starting point while keeping commercial and technical terms subject to an actual project review.
What Huiyao can support
Free court design includes a rendering, installation layout, and quantity list. The supplied dimensions, sports, colors, drawings, line plan, and logo requirements form the design brief.
Build the brief around the actual site
Start with the verified construction area and explain whether the dimensions describe the playing surface or the full available site. List every intended sport, identify the priority use, and describe the base and drainage conditions. Add preferred colors, line colors, logo placement, access constraints, and any fixed site features shown on the drawing.
Review the three design outputs separately
The rendering shows the proposed visual arrangement. The installation layout shows how the modular floor and markings are planned across the confirmed area. The quantity list records the product amount calculated from that layout. Buyers should review all three rather than approving the rendering alone. Changes to dimensions, product model, line plan, logo, or construction area may change the installation layout and quantity, so the final version should match the project information used for the quotation.
Keep local responsibility visible
The design package does not certify the site or replace engineering. Local rules, governing body requirements, safety areas, drainage, base suitability, construction tolerances, and installation conditions remain part of the buyer's project review. Installation and base suitability remain part of the project review.
From confirmed design to quotation
After the buyer reviews the design outputs, the selected model, quantity, packing, destination, and customization move into the quotation process. Product stock and dispatch are reconfirmed at that point. In-stock products ship within three days after payment, subject to order confirmation. If the project changes after approval, the layout and quantity should be reviewed again before the order is finalized. This keeps the commercial record tied to the same dimensions and product assumptions used in the design. The confirmed version should be retained with the quotation so later production discussions refer to the same court plan.
Boundaries that remain important
The rendering, layout, and quantity list do not replace local engineering, construction, safety, or regulatory checks.
Send the project details.
Share the application, area and any drawings you already have.